All World Construction LLCSan Diego County · CSLB 1063936Call 619-327-9513
Exterior Stair RepairSan Diego · All World Construction
All World Construction LLC

A repair process you can follow.

This website is operated by All World Construction LLC, owned by Austin Mitchell. We are a San Diego County general contractor handling multi-trade repairs, property-management work and exterior restoration.

Licensed contractor · CSLB 1063936

Understand the work before approving it.

One documented repair plan for the stair, landing, railing, water details and surrounding finishes.

More about All World Construction ↗

  1. Share the problem

    Send wide and close photos, the property type, affected level, known reports, repair history and who controls access. Do not enter or load an area that appears unsafe to obtain photos.

  2. Confirm fit

    AWC reviews whether the request fits exterior stair and multi-trade repair, what information is missing, and whether use restrictions or qualified professional direction should come first.

  3. Evaluate the site

    Detailed, occupied, water-related or structurally uncertain work may require the $250 Site Evaluation + Written Bid Package before responsible pricing. The fee is credited back if construction is approved within 30 days.

  4. Define the repair

    The written scope identifies visible work, planned openings, retained and replaced materials, railing and water-detail interfaces, finish limits, access assumptions and unresolved conditions.

  5. Build and document

    Approved construction follows the written scope, with site-specific coordination for access, protection, required reviews, concealed conditions, inspections and photo documentation where included.

A clear next step

Tell AWC what needs repair.

Send the visible condition, property location and useful photos. AWC reviews the request and explains the next appropriate step.

Request a repair review

Call 619-327-9513

If the condition needs field verification, AWC may recommend the $250 Site Evaluation + Written Bid Package. The $250 is credited if the construction project is approved within 30 days.